FenceAndDeckGuide.com
Get free quotes

Menu

Own one of these businesses? Claim your listing to update it and get quote requests.

For builders

Fence and deck rules in Idaho

What the state says about fence and deck work, with the page each rule comes from. It's a summary of the published rules, not legal advice, and your city or county can have rules of its own, especially on permits.

Updated November 20, 2026

On this page: 7 sections
  1. 1Check the license before you hire
  2. 2Insurance and bonds
  3. 3What protects you when you hire
  4. 4Permits
  5. 5Fences and property lines
  6. 6Cities and counties with their own licenses
  7. 7Where to complain

Check the license before you hire

Idaho makes it unlawful to work as a contractor, or to hold yourself out as one, without the registration the law requires.1 Idaho defines construction to include building, repairing, improving or demolishing any other structure or improvement to real property.1 A registered contractor must show its registration number on advertising, contracts, permits, letterheads and purchase orders.1

A job considered casual, minor or inconsequential, whose labor, materials and all other items total less than $2,000, needs no registration, but splitting a larger job into smaller contracts to avoid the chapter does not qualify.1 A homeowner doesn't need to register to build on their own residential property, unless they intend to evade the chapter by selling it during construction or within 12 months of completion, or promptly sell it without occupying it as their primary residence for 12 months before the sale.1-2

Insurance and bonds

A registering contractor must carry general liability insurance, including products and completed operations coverage, of at least $300,000 single limit, plus workers' compensation insurance or a written statement of why it isn't required.1

What protects you when you hire

  • A general contractor must give a homeowner a written disclosure statement before a contract over $2,000 to build, alter or repair improvements on a home of one to four units, and must keep proof that the homeowner received it.3 This does not apply when the homeowner starts the contact for a bona fide emergency or for necessary electrical, plumbing or water system repairs.3
  • The disclosure must list each subcontractor, materials supplier and rental firm with a direct contract that supplied more than $500 of materials or work on the home.3
  • You may require lien waivers from subcontractors, and a surety bond up to the project's value, at your expense.3 You may also receive proof of the contractor's general liability and workers' compensation insurance.3
  • Leaving out a required disclosure is an unlawful and deceptive act under the Idaho Consumer Protection Act.3
  • A seller may not have you sign a contract with blanks to be filled in later, and must give you a legible copy of anything you sign.4
  • A home solicitation sale is a regulated consumer credit sale that the seller personally solicits and you agree to at your home.5 You may cancel it until midnight of the third business day after you sign, by written notice to the seller at the address in the agreement.6 In a home solicitation sale, the agreement must be dated the day you sign and, unless its statement of rights complies with an applicable FTC cancellation notice rule, carry the caption "BUYER'S RIGHT TO CANCEL".7 The seller must return your payments and any trade-ins within 10 days after a cancellation notice.8
  • A contractor that should have been registered, unless otherwise exempt, is denied and waives any right to place a lien on real property.1
  • An unregistered contractor, unless otherwise exempt, gives up any right to a lien on your property, though a duly registered subcontractor, or an employee or supplier with no actual knowledge that the contractor was unregistered, keeps its own.1
  • A lien claim must be filed within 90 days after the work or materials are complete.3 If a lien is filed, you may withhold that amount from your contractor while the case runs, and deduct any judgment and costs from what you still owe.3

Permits

  • A permit must show the contractor's registration number, or the phrase "no contractor registration provided" for an exempt applicant, and it must be posted at the site where those words are visible.1
  • A city or county that issues building permits and performs code enforcement must adopt the Idaho residential code.9
  • Where a city or county enforces a building code, construction needs a permit under its ordinances first.9

Fences and property lines

  • A lawful fence must be at least 4 1/2 feet high, with its bottom board, rail, pole or wire no more than 20 inches above the ground and the space between the top and bottom well divided, unless the chapter provides otherwise.10
  • When adjoining owners' land is enclosed by one fence and a partition fence is needed between them, the notified neighbor must build half of it on or near the line.11 If that neighbor doesn't finish within six months after written notice, the other owner may build the whole fence, collect half its cost, and hold a lien on the land.11

Cities and counties with their own licenses

Since January 1, 2007, no Idaho city, county or other local government may run its own registration or licensing program for construction contractors.1

Where to complain

  • The Idaho Contractors Board investigates a written complaint from a person who says a contractor injured or defrauded them, and it may seek injunctive relief barring the person from construction.1, 12 The board's site has a "File a Complaint Against a Registration" option.12
  • The Attorney General's Consumer Protection Division enforces the Idaho Consumer Protection Act and offers a Consumer Complaint Form.13
  • A private lawsuit under the Idaho Consumer Protection Act must be brought within two years after the cause of action accrues.14
Request a quoteSmart search