Fence permits in the City of Miami

What the City of Miami asks for before you build a fence, who can pull the permit, the upfront fee rule for small jobs, how review works, and where the height and placement rules are.

Updated October 23, 2026 · 1 official source
On this page: 4 sections
  1. 1Before you apply
  2. 2What to send
  3. 3How the permit is issued
  4. 4Things that slow a permit down

The City of Miami requires a permit to build a fence, at a house or a business.1 This guide covers the City of Miami only, not the rest of Miami-Dade County. To check that your property is inside city limits and find its folio number, search your address in the city's zoning map. An address outside the city won't come up.

Before you apply

  • Check the zoning rules for fences. They're in the city's Miami 21 zoning code. For a property in the T3 zone, the city publishes a T3 fence guide to the zoning requirements and a guide with building details. If you don't know your zone, the city's zoning category lookup will tell you.
  • Decide who'll pull the permit. The city recommends a qualified licensed contractor. The owner of a home may qualify as an owner-builder, which takes an exam and an interview.
  • A fence around a construction site needs a temporary use permit instead.1

What to send

You'll need these documents:1

  • A survey. It must be from a certified surveyor, no more than a year old and drawn to scale.
  • A site plan showing where the fence goes in relation to the buildings and property lines.
  • The fence's details: its height, materials, type and location, which can be drawn on the survey. A fence company can usually supply these. The Building Department can also provide details for the most common fence types if you ask at its office.

How the permit is issued

  1. Apply through the city's iBuild system: "start application", then "building application". You can upload the plans or take them, with the signed and notarized application, to the Building Department at 444 SW 2nd Ave., 4th floor.
  2. Pay the upfront fee. It's based on the project's total cost, and a home project costing less than $2,500 has no upfront fee.1
  3. The city screens the submission, then reviews it. The first review cycle for a building permit usually takes 14 business days, and corrections may go back and forth more than once.
  4. After approval, pay any re-review fees, pull the permit and print the permit card. Keep the card, the survey and the fence details on site while the work is done.
  5. When the fence is finished, schedule the inspections that close the permit.1

Things that slow a permit down

The city's own tips:1

  • A home fence taller than six feet goes to structural review, which is slower than using the standard fence details.
  • Wherever there's a driveway, the fence has to meet the visibility triangle in section 3.8.4.1 of Miami 21.
  • Asking for an exception to the code, a waiver, is a lengthy process.
  • If trees are involved, you'll also need a tree removal permit.

A zoning information specialist at the Building Department's offices, 444 SW 2nd Ave., 4th floor, can explain what's allowed. The Building Department's number is 305-416-1100.1

City of Miami Building Department, checked October 2026.